欧美不在线-欧美操-欧美操操-欧美操操操-四虎免费在线-四虎免费在线播放

ChineseEnglish Hotline:0571-86062609
Industry information current location:Home  > News > Industry information
Water jet loom Click rate: Release time:2024-02-18 Information sources:Hangzhou Qiyao New Material Co.,Ltd.

Water woven fabric production can be divided into two processes.

Before the process of twisting, winding, warping, threading warp.

Fixed twist: After twisting the yarn, especially after strong twisting, the fiber produces torsion stress, and the yarn will be untwisted and twisted when the yarn tension is small or free. In order to prevent this phenomenon and make the post-processing proceed smoothly, fixed twist processing is used to stabilize the twist of these yarns when necessary.

Winding simple: It is the first process of preparation before weaving, which is to process the yarn or Hank from the spinning department into a bobbin that meets certain requirements on the winding machine.

Warping: The process of winding a fixed number of warp threads parallel to a warp or knitting shaft in a specified length and width. The warped warp is used for sizing and threading. Warping requires that the tension of each warp is equal, the distribution on the warp shaft or the knitting shaft is uniform, and the color yarn arrangement conforms to the process regulations.

Threading warp: Threading warp is a general term for threading and knotting, and its task is to pass the warp on the weaving shaft through the warp stop, heald and reed at one time according to the provisions of the fabric drawing. Threading is the last step in preparing the warp before knitting.

After the process of opening, filling, filling, winding, letting off.

Opening: The opening mechanism is generally composed of a harness lifting device, a harness back device, and a control device for the lifting order of the harness frame. In the shed structure, the first half of the shed can not be changed, it is related to the weft insertion system, the new bow | weft requires the first half of the shed is small. The length of the back shed directly affects the warp tension. Because of the low strength of the yarn, the back shed is required to be long.

Weft insertion: On the loom, weft insertion is to introduce the weft into the shed formed by the opening of the warp, so that the warp and weft are interwoven to form the fabric. The | weft insertion method of the water-jet loom uses water as the weft insertion medium, and generates friction traction on the weft yarn through the jet stream, which leads the weft yarn on the fixed bobbin into the shed.

Weft beating: On the loom, relying on the reed of the weft beating mechanism to move back and forth, the weft yarn of a bow | into the shed is pushed to the knitting edge and interwoven with the warp yarn to form the fabric meeting the design requirements.

Pick up: After the weft is driven into the weave to form the fabric, the fabric must be continuously drawn away from the weave and wound onto the roll.

Let off: the warp of the corresponding length is released on the weaving shaft, so that the warp and weft yarn is continuously interwoven to ensure the continuous production process of weaving.

Copyright ? 2017 qiyaomaterial.com All Rights Reserved Copyright·Hangzhou Qiyao New Material Co.,Ltd. Zhejiang ICP No. 17034714-1
主站蜘蛛池模板: 国产日本久久久久久久久婷婷 | 成年人毛片视频 | 精品三级国产精品经典三 | 国自产在线精品免费 | 久草91| 国产精品视频一区麻豆 | 久久久本网站受美利坚法律保护 | 国产精品福利午夜h视频 | 俄罗斯aa毛片一级 | 国产成人午夜性a一级毛片 国产成人亚洲精品2020 | 国产高清一 | 狠狠大日本亚洲香蕉亚洲 | 男女福利视频 | 黄色一级毛片免费看 | 国产在线不卡一区 | 高清一级做a爱免费视 | 狠狠狠狠狠狠狠 | 嫩草影院视频 | 国产一级片播放 | 久久午夜影院 | 九九精品视频一区在线 | 国产片毛片| 国产理论最新国产精品视频 | 久久久久国产精品 | 国产aav| 久久久五月 | 麻豆视频一区二区 | 精品国产一区二区三区久久 | 成年网站在线在免费播放 | 国产另类的人妖ts视频 | 另类专区国产在线视频 | 久久久青草青青国产亚洲免观 | 国产精品欧美久久久久天天影视 | 国产综合视频在线观看一区 | 国产一级做a爰片在线看 | 丁香激情综合色伊人久久 | 农村寡妇一级毛片 | 国产日产亚洲欧美综合另类 | 国产成人av在线 | 久久久亚洲欧洲日产国码二区 | 女人18毛片a级毛片免费视频 |